MFG-MECH15-01 · Lesson 2 · 22 clock hours · lab

Lockout/Tagout and Electrical Safety Practice

Objective. Students perform a full lockout/tagout sequence on a simulated multi-energy-source training station and verify absence of voltage using a calibrated test instrument, following the written procedure without coaching.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed engineer or certified journey-level tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Why Lockout/Tagout Matters

Every year, workers are seriously injured or killed when equipment is accidentally energized during maintenance. OSHA 29 CFR 1910.147 — the Control of Hazardous Energy standard, commonly called Lockout/Tagout (LOTO) — exists to prevent those injuries. In a robotics and mechatronics environment you will encounter multiple energy sources simultaneously: 120 V AC control circuits, 480 V motor feeds, compressed air, hydraulic pressure, gravity loads, and stored spring energy. You must control all of them before touching internal parts of any machine.

OSHA 29 CFR 1910.147: The Six-Step LOTO Sequence

The standard requires a written energy-control procedure for each piece of equipment. Follow these six steps in order — skipping or reordering any step is a critical error.

Step 1 — Notify affected employees. Tell everyone who works on or near the equipment that it will be shut down and why.

Step 2 — Identify all energy sources. Read the machine's written procedure. On the training station this means identifying the 120 V AC feed, the pneumatic supply line, and the stored-spring mechanism. Never rely on memory alone.

Step 3 — Shut down the equipment. Follow the normal stopping procedure — push the stop button, close valves, let the machine reach a complete stop.

Step 4 — Isolate all energy sources. Open the main disconnect, close the pneumatic isolation valve, and mechanically block or restrain the spring load. An energy-isolating device (disconnect switch, valve, or block) must be capable of being locked in the safe position.

Step 5 — Apply lockout/tagout devices. Place your personal padlock on every isolating device. When more than one technician works on the same machine, use a hasp so that each person applies their own lock. Attach a standardized lockout tag stating your name, the date, and the reason. The lock stays on until you personally remove it.

Step 6 — Verify absence of stored or residual energy and test for zero energy state. Bleed the pneumatic line to zero PSI. Allow springs to release into a blocked position or physically restrain them. Then use a calibrated test instrument to confirm zero electrical energy at every point you could contact (see the Voltage Verification section below). Only after verification is the equipment safe to work on.

Restoring energy reverses the sequence: remove tools, replace guards, notify employees, remove locks in reverse order of application, and only then restore power.

Voltage Verification with a Digital Multimeter

A calibrated CAT III-rated digital multimeter (DMM) is the correct instrument for verifying absence of voltage at terminal strips and motor-control panels up to 600 V. Follow the "test-before-you-touch" rule every time:

1. Confirm the DMM leads and meter are CAT III rated for the voltage present before isolation.

2. Prove the meter works on a known live source before testing the de-energized circuit.

3. Test phase-to-phase, then phase-to-neutral, then phase-to-ground at every terminal you might contact. Log each reading on your work order.

4. Prove the meter still works on the same known source after testing. If it failed between checks, the test result is invalid — start over.

Zero volts on all three checks confirms absence of voltage. Record all readings; your signature on the work order is a legal record.

NFPA 70E Electrical Safety: Arc-Flash and Shock Boundaries

NFPA 70E (Electrical Safety in the Workplace) defines approach boundaries for energized electrical equipment and specifies required PPE. These apply whenever you might be working near energized parts — even when your intent is to verify de-energization.

Shock protection boundaries (for a 480 V motor-control center):

Arc-flash boundary — the distance at which a worker could receive a second-degree burn from an arc-flash event. Inside this boundary, arc-rated (AR) clothing and a face shield rated for the incident energy level are required. NFPA 70E assigns PPE categories based on incident energy calculated through an arc-flash hazard analysis. Your facility's arc-flash label on the panel tells you the required PPE category; never guess.

Minimum PPE when working within the arc-flash boundary includes: arc-rated shirt and pants or coverall (appropriate cal/cm² rating), arc-rated face shield, safety glasses, Class 0 rubber insulating gloves with leather protectors, and safety shoes. Select gloves rated for the maximum voltage present.

Energized electrical work requires an energized electrical work permit signed by management when the work cannot be performed in a de-energized state. This is not routine — de-energizing and locking out is always the preferred method.

NFPA 79 and Machine Guarding

NFPA 79 (Electrical Standard for Industrial Machinery) governs wiring and electrical equipment on industrial machines, including the training station you will use. OSHA 1910.212 requires machine guards to be in place whenever the machine is operating. During your LOTO sequence, you may remove guards only after the machine is in a verified zero-energy state; replace all guards before removing locks and restoring energy.

Your Responsibility in the Lab

Every student performs the full six-step LOTO sequence individually. The instructor observes with a 20-item checklist. A critical error — any action that leaves an energy source live — requires an immediate stop, a review of the written procedure, and a complete re-demonstration before you may continue. Think of the checklist as your procedure: it keeps you and your future coworkers alive.

Key terms9

Lockout/Tagout (LOTO)A set of procedures required by OSHA 29 CFR 1910.147 for controlling hazardous energy by isolating all energy sources and securing them with personal locks and warning tags before maintenance work begins.
Energy-isolating deviceA mechanical device — such as a disconnect switch, circuit breaker, valve, or block — that physically prevents the transmission or release of energy and can be locked in the safe (off/closed) position.
Zero energy stateThe condition of a machine or system after all energy sources have been isolated, locked out, and residual energy (stored pneumatic pressure, spring tension, electrical charge) has been released or restrained, verified with a test instrument.
Arc-flash boundaryA distance defined by NFPA 70E within which a worker could receive a second-degree burn from an electrical arc-flash event; arc-rated PPE is required inside this boundary.
Restricted approach boundaryAn NFPA 70E shock protection boundary close to exposed energized conductors; only qualified electrical workers using insulated tools and appropriate rubber insulating gloves may cross it.
CAT III ratingAn IEC measurement category for test instruments indicating they are designed to safely withstand transient overvoltages found in fixed building-installation distribution circuits, making them appropriate for use at panelboards and motor-control centers.
HaspA multi-lock attachment device used during group lockout that allows several workers to simultaneously apply their individual padlocks to a single energy-isolating device so the device cannot be restored until every lock is removed.
Incident energyThe amount of thermal energy (measured in cal/cm²) that could be released at a working distance during an arc-flash event; used by NFPA 70E to determine the required arc-flash PPE category.
NFPA 70E PPE categoryA classification system in NFPA 70E that specifies the minimum arc-rated clothing and equipment a worker must wear when performing tasks within the arc-flash boundary of equipment at various voltage and fault-current levels.

Worked examples4

1. A DMM reads 2.3 V phase-to-ground on a supposedly de-energized 120 V AC training panel. Is the panel safe to work on? What should you do?
  1. Step 1: Any reading above 0 V means voltage is present. The 2.3 V reading may indicate induced voltage, a ground fault, or incomplete isolation — none of which are acceptable.
  2. Step 2: Do not touch the terminals. Re-examine the written LOTO procedure to confirm every energy-isolating device listed has been locked out.
  3. Step 3: Check that the neutral and ground conductors are properly terminated and that no back-feed path (such as a UPS, control transformer secondary, or capacitor) was missed.
  4. Step 4: Prove the DMM still works on a known live source to rule out meter malfunction.
  5. Step 5: Re-test all three combinations — phase-to-phase, phase-to-neutral, phase-to-ground — after resolving the source of voltage.
  6. Step 6: Only when all readings are 0 V and the meter has been re-proved should you log results and declare zero energy state.
Answer: The panel is NOT safe. Any non-zero voltage reading requires finding and eliminating the source before work proceeds. Do not bypass or ignore the reading.
2. Three technicians (A, B, and C) must replace a motor contactor inside a 480 V MCC. How many locks are required, and what device do they use to apply them to a single disconnect?
  1. Step 1: Each technician must apply their own personal padlock — that is 3 locks total.
  2. Step 2: Because a single disconnect must be locked by three people simultaneously, a hasp is placed on the disconnect handle.
  3. Step 3: Each technician closes their own lock through a hole in the hasp. The disconnect cannot be turned on until all three locks are removed.
  4. Step 4: Each technician also attaches a lockout tag with their name, date, and reason.
  5. Step 5: After all locks are applied, each technician verifies absence of voltage at their work point using a CAT III DMM before touching any conductor.
Answer: 3 personal padlocks applied through a single hasp on the disconnect; 3 lockout tags; each person verifies zero energy at their work location independently.
3. You need to scale a 4–20 mA signal to a 0–100 PSI pressure range for a log entry. The DMM reads 12 mA. What is the corresponding pressure?
  1. Step 1: Identify the scaling formula. For a linear 4–20 mA signal: Pressure = [(mA reading − 4) / (20 − 4)] × (maximum − minimum) + minimum.
  2. Step 2: Substitute values. Pressure = [(12 − 4) / (20 − 4)] × (100 − 0) + 0.
  3. Step 3: Calculate numerator and denominator of the ratio: (12 − 4) = 8; (20 − 4) = 16.
  4. Step 4: Compute the ratio: 8 / 16 = 0.5.
  5. Step 5: Multiply by the span: 0.5 × 100 = 50 PSI.
Answer: 12 mA corresponds to 50 PSI.
4. A pneumatic cylinder has a bore area of 3.14 in² and the supply is regulated to 80 PSI. What is the extend force? Why must this force be considered during LOTO?
  1. Step 1: Apply the cylinder force formula: Force = Pressure × Area.
  2. Step 2: Substitute values: Force = 80 PSI × 3.14 in² = 251.2 lb.
  3. Step 3: This cylinder can exert about 251 lb of force — enough to crush a hand or arm if the pneumatic supply is not fully bled and locked out.
  4. Step 4: LOTO Step 6 requires bleeding pneumatic lines to 0 PSI and verifying with the gauge before anyone contacts the cylinder rod or connected mechanism.
Answer: Extend force ≈ 251 lb. This stored pneumatic energy is a recognized hazard under OSHA 1910.147 that must be released and verified at zero before work begins.

The math in this lesson2

Learners scale a 12 mA reading on a 4–20 mA loop to a 0–100 PSI pressure value.
F-LE.1G-MG.2
Brush up in the math halls at newSchoolWorks.com:
In class: Demonstrate the six-step OSHA 29 CFR 1910.147 LOTO sequence on a training panel that includes 120 V AC, a pneumatic supply, and a stored-spring load; students then each perform the sequence individually while the instructor observes using a performance checklist. · Practice NFPA 70E shock and arc-flash boundary identification on a laminated diagram of a 480 V motor-control center: students mark the restricted, limited, and arc-flash boundaries and select the correct PPE category (gloves, face shield, arc-rated clothing) for each zone, citing NFPA 70E requirements. · Use a digital multimeter to verify absence of voltage at terminal strips on the de-energized training panel—students check phase-to-phase, phase-to-neutral, and phase-to-ground before declaring the equipment safe, logging readings on their work order.
Materials: Multi-energy-source LOTO training station; personal padlocks and hasp set; lockout tags; digital multimeter (CAT III rated); PPE kit (class 0 rubber gloves with leather protectors, arc-flash face shield, arc-rated shirt, safety glasses, safety shoes); OSHA 1910.147 written LOTO procedure template; NFPA 70E boundary diagram.
Check: Instructor uses a 20-item LOTO performance checklist; students must complete all six LOTO steps in correct order with zero critical errors (a critical error is any step that would leave an energy source live) and score ≥85% overall; any critical error requires an immediate re-demo and retest.

Practice check40

Answer each question, then check it. Nothing is recorded; this is your own practice.

Industrial Electricity
1. A 24 V DC source drives a 8-ohm resistive load. What current flows, in amperes?
Industrial Electricity
2. A 24 V DC solenoid draws 4 A. How much power does it use, in watts?
Industrial Electricity
3. A 5 V DC source drives a 20-ohm resistive load. What current flows, in amperes?
Industrial Electricity
4. A 24 V DC solenoid draws 4 A. How much power does it use, in watts?
Industrial Electricity
5. A 120 V DC source drives a 10-ohm resistive load. What current flows, in amperes?
Industrial Electricity
6. A 24 V DC solenoid draws 4 A. How much power does it use, in watts?
Industrial Electricity
7. A 48 V DC source drives a 20-ohm resistive load. What current flows, in amperes?
Industrial Electricity
8. A 24 V DC solenoid draws 0.5 A. How much power does it use, in watts?
Industrial Electricity
9. A 120 V DC source drives a 12-ohm resistive load. What current flows, in amperes?
Industrial Electricity
10. A 24 V DC solenoid draws 0.5 A. How much power does it use, in watts?
Industrial Electricity
11. A 24 V DC source drives a 4-ohm resistive load. What current flows, in amperes?
Industrial Electricity
12. A 24 V DC solenoid draws 2 A. How much power does it use, in watts?
Industrial Electricity
13. A 12 V DC source drives a 100-ohm resistive load. What current flows, in amperes?
Industrial Electricity
14. A 24 V DC solenoid draws 4 A. How much power does it use, in watts?
Industrial Electricity
15. A 12 V DC source drives a 24-ohm resistive load. What current flows, in amperes?
Industrial Electricity
16. A 24 V DC solenoid draws 4 A. How much power does it use, in watts?
Industrial Electricity
17. A 5 V DC source drives a 6-ohm resistive load. What current flows, in amperes?
Industrial Electricity
18. A 24 V DC solenoid draws 1.5 A. How much power does it use, in watts?
Industrial Electricity
19. A 120 V DC source drives a 12-ohm resistive load. What current flows, in amperes?
Industrial Electricity
20. A 24 V DC solenoid draws 4 A. How much power does it use, in watts?
Industrial Electricity
21. Two resistors, 1000 ohms and 1000 ohms, are wired in parallel. What is the total resistance in ohms?
Industrial Electricity
22. The same 1000-ohm and 1000-ohm resistors are wired in series. What is the total resistance in ohms?
Industrial Electricity
23. Two resistors, 470 ohms and 1000 ohms, are wired in parallel. What is the total resistance in ohms?
Industrial Electricity
24. The same 470-ohm and 1000-ohm resistors are wired in series. What is the total resistance in ohms?
Industrial Electricity
25. Two resistors, 220 ohms and 330 ohms, are wired in parallel. What is the total resistance in ohms?
Industrial Electricity
26. The same 220-ohm and 330-ohm resistors are wired in series. What is the total resistance in ohms?
Industrial Electricity
27. Two resistors, 220 ohms and 330 ohms, are wired in parallel. What is the total resistance in ohms?
Industrial Electricity
28. The same 220-ohm and 330-ohm resistors are wired in series. What is the total resistance in ohms?
Industrial Electricity
29. Two resistors, 220 ohms and 330 ohms, are wired in parallel. What is the total resistance in ohms?
Industrial Electricity
30. The same 220-ohm and 330-ohm resistors are wired in series. What is the total resistance in ohms?
Industrial Electricity
31. Two resistors, 12 ohms and 6 ohms, are wired in parallel. What is the total resistance in ohms?
Industrial Electricity
32. The same 12-ohm and 6-ohm resistors are wired in series. What is the total resistance in ohms?
Safety / LOTO
33. According to OSHA 29 CFR 1910.147, which step must be completed immediately before a technician may touch internal parts of a machine that has been locked out?
Safety / LOTO
34. A student locks out a training panel but forgets to close the pneumatic isolation valve. Under OSHA 29 CFR 1910.147, this is classified as:
Electrical Safety / NFPA 70E
35. When using a digital multimeter to verify absence of voltage on a de-energized 120 V AC circuit, which test sequence is correct?
Electrical Safety / NFPA 70E
36. NFPA 70E defines the arc-flash boundary as the distance at which a worker could receive:
Safety / LOTO
37. Four maintenance technicians are performing a group lockout on a single 480 V disconnect. Which combination of devices is required so that the disconnect cannot be restored until all four technicians have completed their work?
Safety / LOTO / Applied Math
38. A pneumatic cylinder with a bore area of 5.0 in² is supplied at 60 PSI. What extend force can the cylinder exert, and why must this be addressed in a LOTO procedure?
Electrical Safety / NFPA 70E
39. Under NFPA 70E, which PPE item is specifically required to protect against arc-flash thermal energy when working within the arc-flash boundary of a 480 V motor-control center?
Electrical Safety / Measurement
40. During a voltage-verification test on a de-energized training panel, a student measures 0 V phase-to-phase and 0 V phase-to-ground, but forgets to check phase-to-neutral. The instructor marks a deficiency. Why is the phase-to-neutral check required?