BLD-WELD01-13 · Lesson 3 · 100 clock hours · lab
Pipe, Pressure, and Specialty Welding Tasks
Objective. Where the host employer's scope includes pipe or pressure-vessel work, students will perform or assist with pipe joint fit-up, root pass, fill, and cap sequences in accordance with the applicable ASME Section IX or process-piping procedure, demonstrating awareness of essential variables and quality hold-points.
⚠ Pending professional review
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Pipe, Pressure, and Specialty Welding Tasks
Welding pipe and pressure-vessel components is among the most demanding and closely regulated work in the trade. Every joint must meet a written Welding Procedure Specification (WPS), and every welder must be qualified under the applicable code before touching a production weld. On your externship site you will either assist with or perform these tasks under the direct supervision of a journeyman welder. Whether the work involves ASME Section IX-qualified joints or a specialty task assigned by the employer, the standard is the same: follow the procedure, stop at hold-points, and document what you do.
What ASME Section IX Governs
ASME Section IX of the Boiler and Pressure Vessel Code establishes the rules for qualifying both welding procedures (the WPS and its supporting Procedure Qualification Record, or PQR) and individual welders (the Welder Performance Qualification, or WPQ). A WPS tells the welder exactly which base metals, filler metals, preheat temperatures, interpass temperatures, current ranges, travel speeds, and shielding or backing gases are permitted. If any of those items changes beyond the limits listed in Section IX, it becomes an essential variable — a change that invalidates the existing qualification and requires re-qualification. Common essential variables for pipe welding include base-metal P-number group, filler-metal F-number, whether backing is used on the root, and position.
On a process-piping job governed by ASME B31.3, or on a pressure-vessel repair, the employer's quality program will identify hold-points: specific moments in the weld sequence where work must stop and an authorized inspector (AI) or the supervising welder must verify quality before welding continues. Never skip a hold-point, even if you are under time pressure.
Pipe Fit-Up: Alignment, Root Opening, and Land Dimension
A sound pipe joint begins before the arc is struck. When assisting with fit-up, check three things against the WPS:
1. Alignment (hi-lo): Use a pipe alignment gauge or a straight edge to verify that the inside surfaces of the two pipe sections are flush within the tolerance listed in the WPS. Misalignment concentrates stress at the root and is a common cause of weld failure.
2. Root opening: The gap between the two prepared faces. For GTAW open-root passes on carbon steel pipe, a consistent root opening is critical for full penetration. A weld gauge measures this directly.
3. Land (root face) dimension: The flat or nearly flat portion left at the bottom of the bevel. Too large a land prevents penetration; too small causes burnthrough.
Record every measurement in your field log before tacking. Tack welds are part of the weld, must be made by a qualified welder, and must be incorporated cleanly into the root pass or removed if they crack.
Root, Fill, and Cap Sequence
Pipe welding is done in passes, each with its own purpose:
- Root pass: Fuses the two joint faces and establishes the inside weld profile. GTAW (TIG) is preferred on high-purity or critical systems; SMAW is common on structural and lower-alloy pipe. For GTAW on stainless steel or exotic alloys, an inert purge gas (typically argon) is introduced inside the pipe to prevent oxidation of the root bead.
- Fill passes: Build up the weld metal to near the surface. Maintain interpass temperature within the WPS limits — let the joint cool if necessary, or preheat if the metal has cooled below the minimum.
- Cap pass: Completes the joint to the specified contour and reinforcement. The cap must blend smoothly to the base metal without undercut, overlap, or excessive reinforcement.
At each employer-defined hold-point, stop welding. The supervising journeyman or inspector will perform a visual examination (VT) using a weld gauge, mirror, and flashlight, and may apply liquid-penetrant inspection (LPI or PT) to detect surface-breaking discontinuities. Do not grind or weld over a suspected defect without authorization.
Safety on Pipe and Pressure Work
- LOTO (Lockout/Tagout): Before cutting into any existing line, verify the line is de-energized, de-pressurized, drained, and locked out per OSHA 29 CFR 1910.147 and the employer's LOTO program.
- Confined spaces: Pipe fabrication sometimes occurs inside vessels. Follow the employer's permit-required confined-space program; never enter without proper atmospheric testing and a trained attendant outside.
- Purge gas hazard: Argon is heavier than air and displaces oxygen in low areas. Ensure adequate ventilation when purging is in progress.
- PPE: Wear appropriate lens shade for the process (shade 10–12 for GTAW/SMAW at typical pipe currents), leather gloves and sleeves, and a fire-resistant outer layer. For LPI, wear chemical-resistant gloves when handling penetrant and developer.
- Fumes: Stainless steel and chrome-moly alloys release hexavalent chromium fumes. Use local exhaust ventilation and, if required by the employer's industrial hygiene assessment, a supplied-air or NIOSH-approved respirator.
Specialty Task Alternative
If your host site does not include pipe or pressure work, your supervisor will assign an equivalent specialty task — structural tube, sheet-metal TIG, or hardfacing. Write a one-page technical summary comparing the employer's actual procedure to the school lab procedure for the same process. Identify at least three differences in welding parameters (amperage, wire feed speed, shielding gas mixture, preheat) or acceptance criteria (visual standard referenced, allowable undercut depth, reinforcement height). Cite the specific document or code section that sets each requirement.
Documenting Your Work
Every weld you perform or assist with must be entered in the field log: date, joint identification, process, pass number, result at each hold-point, and the supervising journeyman's initials. This log is your evidence for both the program completion record and any future employer verification of your experience.
Key terms10
Welding Procedure Specification (WPS)A written document that prescribes the essential, nonessential, and supplementary essential variables required to make a weld that meets the applicable code. Welders must follow the WPS exactly.
Essential VariableA change in a welding condition (such as base-metal P-number, filler-metal F-number, or removal of backing) that ASME Section IX considers significant enough to require re-qualification of the procedure or welder.
Welder Performance Qualification (WPQ)The test record demonstrating that an individual welder can produce an acceptable weld using a specific process and within specific variable limits, as required by ASME Section IX.
Hold-PointA defined step in a welding or fabrication sequence where work must stop and an authorized inspector or supervising welder must verify quality before the next operation begins.
Root OpeningThe gap between the prepared faces of two pipe or plate sections at the bottom of the joint, specified in the WPS to control root penetration.
Land (Root Face)The narrow, flat or slightly rounded portion at the bottom edge of a beveled pipe end; it controls burnthrough and affects full-penetration weld quality.
Purge GasAn inert gas, typically argon, introduced inside a pipe during GTAW root-pass welding to shield the back side of the root bead from atmospheric oxygen and prevent oxidation or sugaring.
Liquid-Penetrant Inspection (LPI/PT)A nondestructive examination method in which a colored or fluorescent penetrant is applied to a weld surface, allowed to dwell, and then drawn out by a developer to reveal surface-breaking discontinuities.
Interpass TemperatureThe temperature of the weld joint measured between passes. The WPS specifies both a minimum (related to preheat) and a maximum interpass temperature to control heat input and prevent metallurgical problems.
Hi-Lo (Misalignment)The offset between the inside surfaces of two mating pipe ends at the joint. Excessive hi-lo produces stress concentration and is measured with a pipe alignment gauge against WPS tolerances.
Worked examples4
1. The WPS for a 3-inch Schedule 80 carbon steel pipe joint specifies a root opening of 1/16 inch (0.0625 in) minimum to 3/32 inch (0.094 in) maximum. After tacking, you measure the gap at four clock positions: 12 o'clock = 0.070 in, 3 o'clock = 0.060 in, 6 o'clock = 0.090 in, 9 o'clock = 0.055 in. Which positions are within tolerance, and which require correction before the root pass?
- Step 1 — Identify the WPS limits: minimum 0.0625 in, maximum 0.094 in.
- Step 2 — Compare each measurement to the limits: 12 o'clock 0.070 in — within range (0.0625 ≤ 0.070 ≤ 0.094). 3 o'clock 0.060 in — below minimum (0.060 < 0.0625). 6 o'clock 0.090 in — within range (0.0625 ≤ 0.090 ≤ 0.094). 9 o'clock 0.055 in — below minimum (0.055 < 0.0625).
- Step 3 — Positions out of tolerance: 3 o'clock and 9 o'clock are both below the minimum root opening. The tacks at those positions must be removed or the pipe repositioned to open the gap before the root pass begins.
- Step 4 — Document all four measurements and corrective action in the field log before proceeding.
Answer: 12 o'clock (0.070 in) and 6 o'clock (0.090 in) are within WPS tolerance. The 3 o'clock (0.060 in) and 9 o'clock (0.055 in) positions are below the 0.0625 in minimum and must be corrected before the root pass.
2. Your WPS allows a maximum interpass temperature of 350 °F for a chrome-moly pipe weld. After completing the second fill pass, a contact pyrometer reads 410 °F at the joint. How long should you wait before checking the temperature again, and what must the reading be before you start the next pass?
- Step 1 — The maximum interpass temperature is 350 °F. The joint is currently at 410 °F, which exceeds the limit by 60 °F.
- Step 2 — Stop welding immediately. Do not start the next pass at this temperature.
- Step 3 — Allow the joint to air cool (or use approved cooling method per employer procedure). Re-check with the pyrometer periodically — every 2 to 3 minutes is typical — until the reading drops to 350 °F or below.
- Step 4 — Before striking the arc again, also verify the joint is still at or above the minimum preheat temperature specified in the WPS (for chrome-moly, preheat minimums can be significant; confirm against the WPS).
- Step 5 — Record the hold, the temperature readings taken, and the time welding resumed in the field log.
Answer: Wait and re-measure until the pyrometer reads 350 °F or below. Then confirm the joint is still at or above the WPS minimum preheat temperature before resuming the next fill pass. Document the delay in the field log.
3. At the end of the shift, the journeyman reviews your field log. You completed 8 pipe weld passes subject to hold-point inspection. 6 were accepted at first inspection. 2 required repair. Did you meet the program's pass standard of 70 percent first-pass acceptance?
- Step 1 — Identify the pass standard: at least 70 percent of student-performed welds accepted at first inspection without major repair.
- Step 2 — Calculate the first-pass acceptance rate: 6 accepted ÷ 8 total = 0.75, or 75 percent.
- Step 3 — Compare to the standard: 75 percent ≥ 70 percent.
Answer: Yes. A 75 percent first-pass acceptance rate meets the program's 70 percent minimum standard.
4. A pipe bevel is specified at 37.5° with a land of 1/16 inch (0.0625 in). You measure the land at three points around the pipe end with a weld gauge and get readings of 0.062 in, 0.080 in, and 0.070 in. The WPS states the land shall be 1/16 in ± 1/32 in. Which readings are acceptable?
- Step 1 — Convert the tolerance to decimal: 1/32 in = 0.03125 in. Acceptable range = 0.0625 − 0.03125 = 0.03125 in (minimum) to 0.0625 + 0.03125 = 0.09375 in (maximum).
- Step 2 — Check each reading: 0.062 in — within range (0.03125 ≤ 0.062 ≤ 0.09375). 0.080 in — within range (0.03125 ≤ 0.080 ≤ 0.09375). 0.070 in — within range (0.03125 ≤ 0.070 ≤ 0.09375).
- Step 3 — All three measurements fall within the allowable range.
Answer: All three land measurements (0.062 in, 0.080 in, and 0.070 in) are within the WPS tolerance of 1/16 in ± 1/32 in (0.03125 in to 0.09375 in). No correction is needed before fit-up proceeds.
The math in this lesson2
Learners compute first-inspection acceptance rate, cool-down wait time, and check root gaps and land readings against limits.
7.RP.3N-Q.3
In class: Assist the supervising welder with pipe fit-up: check alignment, root opening, and land dimension against the WPS; tack-weld per procedure; and document measurements in the field log before the root pass is started. · Perform root, fill, and cap passes (or as many as the employer assigns) on carbon steel or stainless pipe joints using GTAW, SMAW, or GMAW/FCAW as specified; pause at each employer-defined hold-point for visual or liquid-penetrant inspection before continuing. · If the host site does not involve pipe, complete an equivalent specialty task assigned by the employer (structural tube, sheet-metal TIG, or hardfacing) and write a one-page technical summary comparing the employer's procedure to the school laboratory procedure for the same process, citing differences in parameters or acceptance criteria.
Materials: Employer-provided pipe or specialty base metal and filler materials per WPS, purge gas equipment for GTAW root passes if applicable, pipe beveling tools or supplied pre-beveled pipe, visual inspection tools (mirror, weld gauge, flashlight), liquid-penetrant inspection kit if used on site, ASME Section IX reference or employer's procedure documentation, field-log forms.
Check: Supervising journeyman documents each pipe or specialty weld completed by the student in the field log with a pass/fail notation against the employer's acceptance criteria. Pass standard: at least 70 percent of student-performed welds accepted at first inspection without major repair; instructor reviews technical summary for accuracy and rates it satisfactory if it correctly identifies at least three parameter differences or code-requirement references.
Practice check8
Answer each question, then check it. Nothing is recorded; this is your own practice.
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.