Objective. Students will complete all employer site-specific safety and onboarding requirements and demonstrate understanding of the host company's welding procedures, PPE matrix, and emergency response plan before performing any production welding.
Starting an externship is not the same as walking into a school lab. A host employer's worksite is a live production environment where structural steel is being erected, pipe systems are under pressure, and multiple trades work side by side. Before you strike an arc, you must satisfy every safety and onboarding requirement the employer sets. This is not a formality—it protects you legally, physically, and professionally. Employers can and do send workers home who skip or rush this step.
On your first day you will attend the host employer's new-hire safety orientation. Bring your OSHA 10 wallet card. Many construction employers require proof of OSHA 10 completion before they grant site access; if the employer accepts your card, note the name of the person who verified it in your field log. If additional site-specific training modules are required—confined-space awareness, fall protection, or mobile-equipment awareness are common—complete them fully before entering the work area.
Sign every site-access form and hazard-acknowledgment document the employer presents. These forms document that you have been informed of site hazards, which is both a legal record for the employer and evidence that you took your responsibilities seriously. Keep a personal copy when permitted.
Your school lab PPE is a starting point, not a ceiling. The host employer has a PPE matrix—a table that lists each task, the hazard associated with it, and the minimum PPE required. Review this matrix before you touch any equipment. Common welding-site requirements include:
Never substitute or downgrade employer-required PPE. If the employer issues PPE to you, inspect it before use and report damaged items immediately.
Within your first day, walk the assigned work area with your supervising journeyman or foreman. Your job during this walk is to locate and record the following in your field log:
1. Fire extinguishers: type (Class ABC or Class D if combustible metals are present), location, and last inspection date on the tag.
2. Eyewash stations: plumbed or portable, location, and whether the weekly activation log is current.
3. First-aid kit: location and who the site first-aid responder is.
4. Muster points: the designated assembly area if an evacuation alarm sounds. Know at least two exit routes from your assigned area.
5. Lockout/tagout (LOTO) energy-isolation points: identify the disconnect switches, valve isolation points, and stored-energy sources (pneumatic, hydraulic, electrical, gravity) for every piece of welding equipment you will operate. OSHA's Control of Hazardous Energy standard (29 CFR 1910.147 and 1926.417 for construction) requires that equipment be de-energized and isolated before service or setup. Even routine cable changes count. Use the employer's LOTO procedure exactly—do not improvise.
Record every finding in your field log with the date, time, and name of the person who walked with you.
A Welding Procedure Specification (WPS) is the written document that tells a welder exactly how to make a code-compliant weld: the base metal group, filler metal classification, welding process, position, preheat and interpass temperature, voltage, amperage, travel speed range, and post-weld heat treatment if required. On structural steel sites the governing code is typically AWS D1.1; on pressure-piping work the governing code is ASME Section IX. The employer's WPS has already been qualified by testing (documented in a Procedure Qualification Record, or PQR). You do not change the WPS—you follow it.
Before your first production weld, read the applicable WPS with your supervisor. Identify the essential variables: the parameters whose change would require requalifying the procedure. Common essential variables include base-metal P-number or group, filler-metal F-number and A-number, welding position, and minimum preheat temperature. Note any differences between the site WPS and the procedures you used at school—differences are normal, but you must discuss them with your supervisor and adjust your technique accordingly. Document this review in your field log.
Your field log is reviewed by your instructor at the end of days 1 through 3. Each entry must include the date, site location, task performed or observed, safety observations, and any WPS or procedure notes. Incomplete entries will be returned for correction. Think of the log as proof that you worked safely and thoughtfully—it is the externship equivalent of a test grade.
Answer each question, then check it. Nothing is recorded; this is your own practice.