Objective. Students will classify pipe weld discontinuities by type and cause, explain the principles of radiographic testing and ultrasonic testing as used in pipe weld quality assurance, and correctly complete an ASME Section IX welder-qualification record for a sample test weld.
A pipe weld that looks clean on the outside can still fail in service. Pressure piping carries fluids or gases that impose cyclic stress on every joint. A hidden crack or pocket of porosity that goes undetected today becomes a leak path — or a rupture — tomorrow. Inspection is not a bureaucratic step at the end of the job; it is the mechanism that connects your work at the hood to the safety of everyone downstream. ASME Section IX sets the welder-qualification standard, and ASME Section V governs the nondestructive examination methods used to verify the finished weld. Understanding both documents is essential for pipe welders working in the building-and-construction sector.
A discontinuity is any interruption in the ideal structure of a weld. A defect is a discontinuity that exceeds the acceptance limits of the applicable code. Not every discontinuity is a defect, but every defect starts as a discontinuity. The major types found in pipe welds are:
Porosity — spherical or irregular gas pockets trapped in the solidifying weld metal. Causes include contaminated base metal (oil, moisture, mill scale), wet electrodes, excessive travel speed, or improper shielding-gas coverage. Scattered porosity is less severe than clustered or linear porosity.
Lack of fusion (LOF) — the weld metal fails to bond to the base metal or to a previous weld pass. Common causes: insufficient heat input, improper electrode angle, or moving too fast through a tight joint. LOF is a planar defect — it presents a sharp stress-concentration edge and is treated seriously by every code.
Incomplete penetration (IP) — the root pass does not penetrate fully to the inside diameter of the pipe. Causes include a root opening that is too tight, amperage that is too low, or incorrect electrode manipulation. In pressure piping, incomplete penetration is generally rejectable because the un-fused root acts as a notch under internal pressure.
Cracks — linear fractures in the weld metal or heat-affected zone (HAZ). Hot cracks form during solidification (often from high sulfur content or improper bead shape). Cold cracks (hydrogen-assisted cracking) develop after the weld cools, sometimes hours later, usually in the HAZ. Cracks are rejectable under all pipe codes regardless of size.
Overlap — weld metal that rolls over the base metal surface without fusing to it. It looks like a small shelf at the weld toe. Caused by excessive weld metal deposited at too low a temperature or by the wrong electrode angle.
Before any nondestructive examination (NDE) method is applied, the welder and inspector perform a visual inspection (VT). The AWS D1.1 visual acceptance criteria table and the applicable ASME standard both define maximum allowable undercut depth, reinforcement height, surface porosity, and crack indications. VT is performed with adequate light (minimum illuminance levels are specified in ASME Section V), and the inspector examines both the outside diameter and, where accessible, the inside diameter of the pipe.
Safety note: when handling rejected coupons used for training, wear leather gloves — cut edges and spatter are sharp. When using a film-viewing box, do not stare directly at the light source; the luminance can cause eye fatigue.
RT passes X-rays or gamma rays through the weld. Denser material (sound weld metal) absorbs more radiation; voids, cracks, and porosity absorb less and therefore appear as darker areas on the film or digital image. RT produces a permanent record (the radiograph) that can be reviewed later and compared against acceptance criteria. It is excellent at detecting volumetric discontinuities (porosity, inclusions) but can miss tight planar defects (cracks, LOF) if they are not oriented parallel to the radiation beam. ASME Section V, Article 2 governs RT of welds.
UT introduces high-frequency sound waves into the weld. When the wave hits an interface — a void, crack face, or inclusion — part of the energy reflects back to a receiver. The time of flight and amplitude of the echo indicate the depth and relative size of the discontinuity. UT is particularly effective at detecting planar defects and can be used on thick-wall pipe where RT becomes impractical. Phased-array UT (PAUT) is increasingly common on critical pipe joints. ASME Section V, Article 4 covers ultrasonic examination.
MT detects surface and near-surface discontinuities in ferromagnetic materials by applying a magnetic field and iron-particle media. PT detects surface-breaking discontinuities in any material by applying a penetrant dye, waiting for it to enter open defects, removing excess penetrant, and applying a developer that draws the dye back to the surface. Both methods are governed by ASME Section V (Articles 7 and 6, respectively) and are commonly used to examine root passes before subsequent passes are deposited.
Safety note: MT yokes operate on line voltage — inspect the power cord before use. PT chemicals are flammable and irritating; use them only in ventilated areas, wear nitrile gloves and safety glasses, and follow the SDS for each product.
When a welder passes a qualification test, the responsible organization must record the results on a Welder Qualification Record (WQR), sometimes called a Welder Performance Qualification (WPQ) record. The WQR captures essential variables — the parameters that define the limits of the welder's qualification. If any essential variable changes beyond the allowed range, the welder must retest.
Key fields on the WQR include: welder's name and stamp number; welding process (SMAW, GTAW, GMAW, etc.); base metal P-number; filler metal F-number; position (1G, 2G, 5G, 6G, etc.); wall thickness and diameter of the test coupon; type of backing (with or without); and the NDE or bend-test results used to qualify the weld. Every field is meaningful. An incomplete WQR can disqualify a welder on a job site audit, costing time and money.
When completing a WQR, work through the form systematically: identify the welding process first, then the material and filler information, then the position, then record test results. Peer review — having a second set of eyes check your entries — is standard practice and is replicated in today's documentation drill.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.