BLD-WELD01-07 · Lesson 2 · 8 clock hours · theory

Title Blocks, Revision Blocks, and Bills of Materials

Objective. Students will extract part numbers, material specifications, drawing scale, revision status, and required quantities from a title block and bill of materials on a structural fabrication drawing.

Why Title Blocks and Bills of Materials Matter

Every structural fabrication drawing is a legal and technical document. Before you strike an arc, you must confirm you are working from the correct, current drawing and that you understand exactly what material to cut, fit, and weld. Two areas on every drawing give you that information: the title block and the bill of materials (BOM). Misreading either one can result in fabricating the wrong part, using the wrong steel, or welding to an outdated revision — all of which can cause rework, project delays, or structural failures.

The Title Block

The title block is a bordered box printed in the lower-right corner of nearly every engineering drawing. It is the first place you look before doing anything else. A standard structural steel title block contains the following fields:

Some title blocks also include the applicable code (such as AWS D1.1) and the engineer of record's stamp.

The Revision Block

Drawings change. Engineers add connections, change plate thicknesses, or move hole locations. Every change is recorded in the revision block, which is usually a small table in the upper-right corner or adjacent to the title block. Each row lists:

Current revision triangles or "cloud" markings may also appear on the drawing face to highlight exactly where the change was made.

Critical rule: Never fabricate from a drawing whose revision letter does not match the revision letter on the current drawing register or traveler issued by your supervisor. If the shop floor has Rev B and the engineer's office has released Rev C, work must stop on that part until the correct print is obtained and the discrepancy is documented and resolved through your company's document-control procedure.

The Bill of Materials

The bill of materials (BOM) — also called the material list or parts list — is a table found on the drawing, commonly above the title block or on a separate sheet in the set. It lists every individual piece needed to fabricate the complete assembly. For structural steel work, each row in the BOM typically includes:

When you receive a cut list or pick a plate from stock, always verify that the heat number or mill certificate for the material matches the ASTM specification shown in the BOM. AWS D1.1 requires that base metals be identified and suitable for the intended welding process.

Reading Scale Correctly

Many beginners try to measure dimensions directly off a print with a ruler. You may do this only if the drawing is printed at its stated scale and has not been reduced by a copier or plotter. If a drawing is marked "NOT TO SCALE" or "NTS," rely solely on the written dimensions. When a scale is given (e.g., 1:10), a dimension shown as 3 inches on paper represents 30 inches on the actual part.

Safety Note

Handling large-format drawings in a fabrication shop introduces its own hazards. Keep drawings away from welding arcs, grinding sparks, and hot metal — paper ignites. Store rolled prints in tubes away from compressed-gas cylinders. Never lay drawings on a welding table that may have sharp slag or hot spots. When referencing a drawing near active welding operations, wear your standard shop PPE (safety glasses, hearing protection as required) and stay clear of arc flash zones.

Connecting to the Credential Exams

NCCER Welding Level 2 (Module 29201) tests your ability to interpret title blocks and BOMs as part of blueprint reading competency. AWS SENSE Level 1–2 performance tasks require that trainees demonstrate they can read and apply information from a drawing before beginning a weld. AWS D1.1 Certified Welder qualification tests are tied to specific WPS documents that reference drawing requirements. Getting this skill right from the start is foundational to every credential you will earn in this program.

Key terms9

Title blockA bordered table in the lower-right corner of an engineering drawing that identifies the drawing by name, number, scale, revision status, and responsible parties.
Revision blockA table, usually in the upper-right corner of a drawing, that records each change made after the original release, including a revision letter, description of the change, date, and authorizing initials.
Bill of materials (BOM)A structured table on a drawing that lists every part needed for an assembly, including item number, quantity, description, material specification, and size.
ASTM designationA material specification code issued by ASTM International (e.g., ASTM A36, ASTM A572 Gr 50) that defines the chemical composition and mechanical properties a steel must meet.
Drawing scaleThe stated ratio between a dimension on the printed drawing and the corresponding full-size dimension on the actual part (e.g., 1:10).
Part numberA unique identifier assigned to each distinct component in a drawing set; it links the BOM row to the matching balloon or callout on the drawing view.
Revision letterAn alphabetical indicator (A, B, C, etc.) that identifies which version of a drawing is current; the shop must always work from the latest revision.
Document controlThe company procedure for issuing, tracking, superseding, and destroying engineering drawings to ensure only the current revision is used for fabrication.
NTS (Not to Scale)A notation on a drawing indicating that printed dimensions cannot be measured directly from the paper; only the written dimension values are valid.
In class: Instructor walks through a full-size structural steel drawing, pointing out each field in the title block, note block, and bill of materials while students annotate a printed copy. · Students complete a scavenger-hunt exercise on five different drawings: they must locate and record material ASTM designation, plate thickness, part count, drawing scale, and latest revision letter for each drawing. · Class discussion on a real-world scenario: the revision block shows Rev C but the shop has Rev B — students write a one-paragraph procedure for how to handle the discrepancy and who to notify.
Materials: Printed full-size structural drawings (minimum five unique drawings), highlighters, NCCER Welding Level 2 Module 29201, AWS D1.1 Structural Welding Code — Steel (reference copy)
Check: Students complete the scavenger-hunt exercise with 80% accuracy on all data fields extracted; instructor reviews each sheet.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

Blueprint Reading
1. Where is the title block located on most structural fabrication drawings?
Blueprint Reading
2. A structural drawing shows a scale of 1:10. A dimension line on the paper measures 2.5 inches with a ruler. What does that line represent on the actual fabricated part?
Material Identification / AWS D1.1
3. The bill of materials on a drawing lists Item 4 as 'ASTM A572 Gr 50, PL 3/4 × 8 × 12.' The stockroom issues you a plate tagged ASTM A36. What is the correct action?
Blueprint Reading
4. Which field in the revision block tells you what specifically changed from the previous version of a drawing?
Blueprint Reading / Quality & Documentation
5. A welder in the shop is holding a drawing stamped Rev B. The current drawing register shows Rev C has been released. What should the welder do first?
Blueprint Reading
6. A drawing is stamped 'NTS' beneath the scale field. What does this mean for a fabricator?
Blueprint Reading
7. In the bill of materials, the 'quantity' column for Item 7 shows the number 4. What does this tell the fabricator?
Safety / Workplace Hazards
8. When working near active welding operations while referencing a large-format drawing, which safety practice is most important?