BLD-WELD01-05 · Lesson 5 · 14 clock hours · lab
Vertical Fillet and Groove Welds (3F and 3G)
Objective. Students will produce fillet and groove welds in the 3F and 3G positions using uphill travel technique with parameters adjusted for vertical welding, meeting AWS D1.1 visual acceptance criteria.
Why Vertical Welding Is Different
When you move from flat (1F/1G) to vertical (3F/3G) position, gravity becomes your biggest challenge. In the flat position the molten puddle sits in a pocket and surface tension does most of the work. In the vertical position the puddle wants to roll downhill. If your travel speed is too slow or your heat is too high, you get overlap (cold lap) at the toes and sagging beads. If your heat is too low or travel is too fast, you get cold lap and lack of fusion. Mastering uphill vertical FCAW means learning to read the puddle and constantly balance heat input against puddle behavior.
Uphill vs. Downhill Progression
For structural work governed by AWS D1.1, uphill (vertical-up) progression is the standard for FCAW on material 3/16 in. and thicker. Uphill travel allows deeper penetration and a larger, more controllable puddle. Downhill is faster but produces a shallower fusion zone and is restricted by code for thicker structural members. All work in this lesson uses uphill progression.
Parameter Adjustments for Vertical Position
Start with your flat-position settings as a baseline, then make the following adjustments:
- Wire feed speed (WFS): Reduce by roughly 10–15 % from your flat settings. Lower WFS reduces heat input and slows puddle formation so gravity has less melt to pull.
- Voltage: Reduce slightly to shorten the arc and stiffen the puddle. A short, tight arc transfers metal more directly and reduces spatter.
- Wire extension (stick-out): Hold 3/4 in. to 1 in. for .045 in. E71T-1C wire. Longer extension increases resistance heating and can make the puddle too fluid.
- Gun angle: Use a 5°–15° push (drag) angle pointed upward into the direction of travel. This directs shielding gas over the puddle and helps support it against gravity.
- Work angle: 45° into the joint for a tee joint (3F); bisect the groove angle for a groove joint (3G).
Always document the WFS, voltage, and shielding gas flow rate (typically 35–50 CFH for 75/25 Ar/CO2 mix) on your weld data card before striking an arc.
The Triangular Weave with Toe Pause
The triangular weave is the most effective motion for vertical fillet and groove welds with FCAW:
1. Start at one toe of the joint.
2. Weave across the puddle to the opposite toe, moving slightly upward as you cross.
3. Pause briefly at each toe — one to two seconds — to allow fusion and fill the undercut-prone zone.
4. Move back across and slightly upward to the first toe, then pause again.
5. The overall path traces a series of overlapping triangles climbing the joint.
The pause at the toes is critical. That is where the base metal is coolest and where undercut forms if you rush. Watch for a bright, fluid keyhole at the toe; when you see it wet in cleanly, begin your cross-travel.
Reading the Puddle
A healthy vertical puddle is slightly elongated, roughly oval, with a bright, fluid leading edge. Warning signs:
- Sagging or drooping puddle: Heat too high or travel too slow — increase travel speed or reduce WFS.
- Dark, sluggish puddle: Heat too low — increase WFS or voltage slightly.
- Undercut at toes: Insufficient pause at toes, or gun angle directed away from the toe — correct motion and angle.
- Overlap (cold lap): Travel speed too slow combined with low voltage — increase voltage slightly and keep moving.
AWS D1.1 Visual Acceptance Criteria
Your completed coupons must meet AWS D1.1 visual acceptance criteria. Key limits include:
- Cracks: None permitted of any size.
- Weld face porosity: Individual pore diameter and cluster limits apply per the code table — no porosity visible to the naked eye above the specified maximum.
- Undercut: Shall not exceed 1/32 in. depth for primary members (check Table 6.1 on your criteria card for the applicable limit).
- Overlap: Not acceptable.
- Fillet weld size: Must meet the specified leg size within the tolerance shown on the drawing or procedure; use your fillet gauge to verify.
- Groove weld reinforcement: Must be within the limits in D1.1 Table 6.1; excessive crown that is too high or too flat both fail.
Use your fillet gauge on every 3F coupon. Measure the minimum leg size at three locations along the weld. Use your groove gauge to check crown height on every 3G coupon.
Safety in the Vertical Position
- Spatter falls. Wear leather welding gloves, a leather apron or jacket, and ensure your collar and cuffs are buttoned. Hot spatter that falls into a boot or glove cuff causes burn injuries.
- Fumes rise toward your face. Ensure local exhaust ventilation (LEV) is positioned above and to the side of the weld zone. In confined or low-ventilation areas use supplied-air respiratory protection per OSHA requirements.
- Chipping slag from a vertical weld. Wear your welding helmet or safety glasses — slag chips fly outward and downward unpredictably. Allow the weld to cool to a safe handling temperature before chipping.
- Positioner or fixture pinch points. Before adjusting a vertical weld fixture, follow lockout/tagout (LOTO) procedures if the positioner is powered. Verify zero-energy state before reaching into the fixture.
- Fire watch. Spatter from vertical welds travels farther horizontally than from flat welds. Clear combustibles from a 35-ft radius and maintain a fire watch for at least 30 minutes after welding stops.
Key terms9
Uphill progressionWelding technique in which the electrode travels from the bottom of a vertical joint to the top, providing deeper penetration and fuller fusion; required by AWS D1.1 for FCAW on structural thicknesses.
Triangular weaveA gun motion pattern for vertical welding in which the welder oscillates side to side while progressing upward, tracing overlapping triangles; a brief pause at each toe prevents undercut and ensures fusion.
Toe pauseA deliberate one-to-two-second stop of gun travel at the toes of a vertical weld bead to ensure complete fusion and prevent undercut at the cooler base-metal edges.
Cold lap (overlap)A discontinuity in which weld metal rolls over the base metal at the toe without fusing to it; caused by excessive heat or insufficient travel speed in vertical welding; not acceptable under AWS D1.1.
UndercutA groove melted into the base metal at the weld toe that is not filled by weld metal; reduces throat dimension and is limited by AWS D1.1 to a specified maximum depth.
Wire extension (stick-out)The distance from the contact tip to the arc; for .045 in. E71T-1C wire in the vertical position, 3/4 in. to 1 in. is typical; excessive stick-out increases resistance heating and makes the puddle too fluid.
E71T-1CAWS filler metal classification for a flux-cored wire: E = electrode, 7 = 70 ksi tensile strength, 1 = all-position capable, T = tubular (flux-cored), 1 = rutile slag system, C = shielding gas CO2 or Ar/CO2 mix.
Heat inputThe amount of thermal energy delivered to the base metal per unit length of weld, influenced by voltage, current (wire feed speed), and travel speed; must be managed carefully in vertical position to prevent sagging or cold lap.
AWS D1.1 Table 6.1The section of the AWS D1.1 Structural Welding Code — Steel that lists visual acceptance criteria for welds, including limits on undercut, porosity, cracks, overlap, and weld reinforcement.
Worked examples4
1. Your flat-position WFS baseline for E71T-1C .045 in. wire is 280 in./min at 25 V. You need to set a starting vertical-uphill parameter. Calculate the adjusted WFS using a 12% reduction.
- Identify the baseline WFS: 280 in./min.
- Calculate the reduction amount: 280 × 0.12 = 33.6 in./min.
- Subtract from the baseline: 280 − 33.6 = 246.4 in./min.
- Round to the nearest practical setting on the wire feeder: approximately 246 in./min.
Answer: Set the wire feeder to approximately 246 in./min as a starting vertical-uphill WFS, then fine-tune by observing puddle behavior.
2. After welding a 3F tee joint coupon, you measure the fillet leg with a fillet gauge at three locations and get readings of 5/16 in., 6/16 in., and 5/16 in. The drawing calls for a 3/8 in. (6/16 in.) fillet. Does the weld pass the size requirement at all three locations?
- Convert the specified size to sixteenths: 3/8 in. = 6/16 in.
- Compare each measurement to the required 6/16 in. minimum.
- Location 1: 5/16 in. — this is less than 6/16 in., so it is undersized.
- Location 2: 6/16 in. — meets the minimum exactly; acceptable.
- Location 3: 5/16 in. — undersized.
- Two of three locations are below the minimum required leg size.
Answer: The coupon does not pass. Two locations measure 5/16 in., which is less than the required 3/8 in. (6/16 in.) minimum leg size. The weld must be repaired by adding a cover pass to bring undersized areas to the required dimension.
3. You are inspecting a 3G groove coupon for weld crown (reinforcement). You measure the crown height above the base metal surface at 3/32 in. AWS D1.1 allows a maximum reinforcement of 1/8 in. for the applicable thickness. Does the crown pass?
- Convert the measured crown to a common denominator: 3/32 in. = 3/32 in.
- Convert the allowed maximum: 1/8 in. = 4/32 in.
- Compare: 3/32 in. ≤ 4/32 in.
Answer: The crown passes. At 3/32 in. it is below the 1/8 in. (4/32 in.) maximum reinforcement limit specified by AWS D1.1.
4. During a troubleshooting exercise the instructor sets the machine to a voltage that is 3 V higher than your correct procedure. Your weld shows overlap at both toes. Calculate the percentage increase in voltage and explain what corrective action is needed.
- Assume the correct voltage is 25 V and the incorrect setting is 28 V.
- Calculate the increase: 28 − 25 = 3 V.
- Calculate the percentage increase: (3 ÷ 25) × 100 = 12%.
- Higher voltage increases arc length and heat input, making the puddle more fluid and prone to rolling over the toe (overlap) before fusing.
- Corrective action: reduce voltage to 25 V, increase travel speed slightly to allow the puddle to freeze before it flows past the toe, and verify toe fusion with a fillet gauge after the next pass.
Answer: Voltage was 12% too high (28 V vs. 25 V correct). Reduce voltage to the procedure value and increase travel speed slightly to eliminate the overlap discontinuity.
The math in this lesson2
Learners reduce wire-feed speed 12% for vertical-up, compute a voltage percent increase, and average fillet-leg readings.
7.RP.3N-Q.3
In class: Instructor demonstrates uphill vertical technique — reduced wire feed speed, tighter arc length, triangular weave with pause at toes — and points out the difference in puddle behavior compared to flat position; students shadow-weld on a practice plate (no arc, gun movement only) to internalize the rhythm. · Students produce three 3F tee joint coupons and two 3G groove coupons with backing, using uphill progression; instructor provides real-time coaching on wire extension, gun angle, and travel speed to correct sagging or cold-lap tendencies. · Students complete a troubleshooting exercise: instructor intentionally sets incorrect parameters on a machine; students identify the resulting discontinuity (overlap or undercut), state the root cause, and correct the settings before restarting the weld.
Materials: CV power source, wire feeder, E71T-1C .045 in. wire, 75%Ar/25%CO2, 3/8 in. A36 tee joint and beveled groove plate, backing bars, positioner or fixed weld table with vertical fixture, fillet gauge, groove gauge, AWS D1.1 criteria card, chipping hammer, wire brush
Check: One 3F fillet coupon and one 3G groove coupon inspected against AWS D1.1 Table 6.1 and visual acceptance criteria; all discontinuity limits must be met; 100% pass on submitted coupons.
Practice check8
Answer each question, then check it. Nothing is recorded; this is your own practice.
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.