Objective. Students will write a machine-specific lockout/tagout procedure and physically isolate a welding machine to a verified zero-energy state following OSHA 29 CFR 1910.147 steps without prompting.
Welding machines store and deliver energy in several forms: electrical power from the supply circuit, capacitive charge held in inverter electronics, and mechanical energy in compressed-gas systems. If a machine starts up—or releases stored energy—while someone is servicing it, the result can be electrocution, arc flash, or crush injury. Lockout/Tagout (LOTO) is the control method that makes unintended energization physically impossible. OSHA's standard for the control of hazardous energy, 29 CFR 1910.147, is the legal baseline every worker in a general-industry welding shop must follow.
A Shielded Metal Arc Welding (SMAW) machine is connected to the building's electrical supply—commonly 208 V, 230 V, or 460 V three-phase. The disconnect may be a wall-mounted switch, a breaker in a panel, or a plug-and-receptacle set. Some inverter-based machines also retain a residual DC charge in capacitors for a short time after power is removed. Before you touch internal components, you must account for all of these sources and verify that each has been brought to a zero-energy state.
OSHA 1910.147 specifies a sequence that authorized employees must follow every time. The steps below apply directly to an SMAW machine:
1. Identify all energy sources. Review the machine-specific LOTO procedure. Note the electrical disconnect location, voltage level, and whether stored energy (capacitive charge) exists.
2. Notify affected employees. Tell every person in the area that the machine is being taken out of service and why. This is not optional—it is an OSHA requirement.
3. Shut the equipment down. Use the machine's own power switch or welding-output control to bring it to a normal stop before isolating energy at the source.
4. Isolate the energy source. Open (turn off) the upstream disconnect switch or remove the plug from the receptacle. This physically separates the machine from its power supply.
5. Apply your personal lock and tag. Place your personal padlock through the hasp on the disconnect; no one can close that disconnect while your lock is on it. Attach a LOTO tag that includes your name, date, reason for lockout, and contact information. Each authorized employee working on the equipment applies their own lock—one lock per person is the rule.
6. Release or restrain stored energy. For most SMAW machines this means waiting the manufacturer's specified bleed-down time for capacitors (check the procedure or technical manual). For any compressed-gas lines involved in the work area, relieve pressure following the appropriate procedure.
7. Verify zero-energy state. Attempt to start the machine using its normal controls—it must not start. Use a calibrated voltage tester on the machine's input terminals to confirm absence of voltage. This verify step is mandatory; assumption is not verification.
OSHA 1910.147 requires employers to document a procedure for each piece of equipment that has more than one energy source or is not simple to control. A compliant written procedure must include:
During today's lab you will complete a LOTO procedure template for the designated SMAW machine before you touch the equipment. Your instructor reviews and approves the document first. This mirrors real-world practice: workers do not improvise—they follow an approved written procedure every time.
After maintenance or inspection is complete, restoration follows the reverse sequence:
1. Confirm all tools and test equipment have been removed from the work zone.
2. Ensure all affected employees are clear of the machine.
3. Notify affected employees that the lockout is about to be released.
4. Remove your personal lock and tag—only you may remove your own lock.
5. Close (re-energize) the disconnect or re-insert the plug.
6. Verify normal operation before returning the machine to production use.
AWS, NCCER, and ASME all require welders to demonstrate knowledge of safe energy-isolation practices. AWS SENSE and NCCER Level 1 safety modules explicitly cover LOTO principles. On job sites governed by AWS D1.1 or ASME Section IX welding procedures, contractors are audited for LOTO compliance. Understanding and executing LOTO correctly protects you legally and physically throughout your career.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.