🚧 Under construction — VoTechWorks is being built. A free tech program — complimentary, as our commitment to get America working.
voTechWorksGrade 13 · a vocational technology learning center, by urbanicity
newSchoolWorks.com › VoTechWorks › Building & Construction › Roofing › Flashing: Waterproofing Transitions and Penetrations › Lesson 3
BLD-ROOF12-05 · Lesson 3 · 14 clock hours · practice

Steep-Slope Flashing Installation: Drip-Edge, Valley, Step, and Counter

Objective. Students will install drip-edge, open and closed valley flashing, step flashing integrated with shingles, and counter flashing into a simulated masonry chase on a pitched roof mock-up, in the correct sequence and with fasteners and laps meeting manufacturer specifications.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Why Flashing Sequence Is Everything

Water runs downhill. Every flashing detail on a steep-slope roof is designed around that single fact. Install a piece in the wrong order and you create a pocket that channels water under the system instead of off it. The four flashing types you will install today — drip-edge, valley, step, and counter — each protect a different transition, and each depends on the others being in the right place first.

Drip-Edge: Eave Before, Rake After

Drip-edge is an L-shaped metal strip (typically aluminum) nailed along the roof perimeter to direct water off the deck and away from the fascia. The sequence rule is firm and non-negotiable:

Fasten drip-edge with roofing nails spaced according to the manufacturer's specification — generally every 8 to 12 inches along the hem, placed high enough that fasteners are covered by the next course of material. Lap end joints in the direction of water flow (upper piece over lower piece) by a minimum typically stated by the manufacturer, often at least 2 inches.

Valley Flashing: Open-Valley W-Metal

A valley is where two roof planes meet at an inside angle. Water volume is highest here. A W-valley (also called W-metal) is a pre-formed 26-gauge galvanized sheet with a raised center rib that separates the two water channels and prevents turbulence from one plane crossing to the other.

Key installation points:

For a closed or woven valley, shingles instead of exposed metal cover the valley, but a mineral-surface cap sheet or membrane underlayment still runs the full length beneath. The principles of sequencing — lower courses first, no exposed fasteners in the channel — remain the same.

Step Flashing: Shingle and Metal, Course by Course

Step flashing protects the joint between a sloped roof surface and a vertical sidewall or chimney. Each step-flashing unit is an individual bent piece of metal (typically aluminum, at least as wide as one shingle exposure and tall enough to turn up the wall several inches — commonly 4 inches horizontal by 4 inches vertical after bending, though dimensions vary by manufacturer and local practice).

The installation alternates: lay a shingle course, set a step-flashing unit on top of that shingle and tight to the wall, nail the flashing unit to the deck only (one nail, high on the flange, covered by the next shingle), then lay the next shingle course over the horizontal leg of the flashing. Each piece overlaps the one below by at least the shingle exposure so no gap is exposed to weather. Never caulk the top edge of step flashing to the wall — that joint must remain open so the counter flashing can do its job.

Counter Flashing: Locking the Top Edge

Counter flashing is the cap that covers the top turned-up edge of the step flashing (or base flashing at a chimney). A two-piece system allows for thermal movement: the reglet piece is embedded in a saw-cut slot (called a reglet) in the masonry, and the cap piece hooks over it and laps down to cover the step-flashing leg.

Safety on the Mock-Up and the Real Roof

Even on a low-pitch mock-up, treat every work platform as a fall hazard. Wear slip-resistant footwear and keep the deck clear of scrap metal and nail drops. When operating a pneumatic nailer, keep the nozzle pointed away from yourself and your partner and engage the safety tip fully before each shot. Eye protection is required whenever cutting metal flashing — aluminum and galvanized steel create sharp burrs and chips. Wear cut-resistant gloves when bending or handling sheet metal edges. Urethane sealant is an irritant; nitrile gloves protect your skin during application.

The Inspection Mindset

Professional roofers inspect their own work before the next course covers it — because once shingles go down, every deficiency is either hidden until it leaks or expensive to uncover. Use the checklist not as a final hurdle but as a real-time guide. If you cannot see the lap, measure it before you nail. If you cannot confirm sealant continuity, run the bead before the flashing goes flat.

Key terms9

Drip-edgeAn L-shaped metal strip nailed along roof eaves and rakes to direct water off the deck edge and protect the fascia; installed before underlayment at the eave and after underlayment at the rake.
W-valley (W-metal)A pre-formed metal flashing with a raised center rib installed in a roof valley to separate and channel water from two converging roof planes without exposed fasteners in the water channel.
End-damA bent or formed stop at the lower end of a valley flashing that prevents water from shooting off the bottom edge and behind the drip-edge or fascia.
Step flashingIndividual L-shaped metal units alternated course by course with shingles along a vertical sidewall or chimney to waterproof the shingle-to-wall transition; each unit is nailed to the deck only.
Counter flashingMetal flashing embedded in a masonry joint or reglet that laps over and conceals the top edge of step or base flashing, allowing thermal movement while sealing the upper joint.
RegletA horizontal slot saw-cut into masonry or pre-formed into a metal receiver, used to anchor and seal the embedded edge of counter flashing.
WatersheddingThe principle that every lap, joint, and fastener placement is arranged so that water flows over — not under — each successive layer, following gravity down the slope.
Urethane roofing sealantA flexible, adhesive-grade caulk used at flashing terminations and reglet entries to seal against wind-driven rain; not a substitute for correct mechanical lapping.
Clip fasteningA method of securing valley or other sheet-metal flashing using formed metal clips at the edges rather than nails through the water channel, allowing thermal expansion without splitting.

Worked examples4

1. The manufacturer's detail sheet specifies that valley W-metal end laps must overlap by a minimum of 6 inches. You have two sections of W-metal: the lower section ends 14 inches above the eave drip-edge, and the upper section begins at the same point. How far above the bottom end of the upper section must its leading edge sit to meet the 6-inch lap requirement, and what is the exposure length of the lower section from the eave drip-edge to the start of the lap?
  1. Identify the required lap: 6 inches minimum.
  2. The upper section must lap 6 inches over the lower section, meaning the upper section's bottom edge is placed 6 inches above the lower section's top cut end.
  3. The lower section ends 14 inches above the eave drip-edge. The lap begins at that 14-inch mark.
  4. Exposure length of the lower section = distance from eave drip-edge to the start of the lap = 14 inches.
  5. The upper section's bottom edge is positioned so it covers the top 6 inches of the lower section, starting at the 14-inch mark and extending down to the 8-inch mark (14 − 6 = 8 inches above eave).
  6. Confirm: the upper section overlaps the lower section from the 8-inch mark to the 14-inch mark — a 6-inch lap. Requirement met.
Answer: The upper section's bottom edge must be placed 6 inches below the top cut end of the lower section (i.e., 8 inches above the eave drip-edge). The exposed, non-overlapped length of the lower section from eave drip-edge to the start of the lap is 14 inches.
2. Step-flashing units must turn up the wall 4 inches and extend horizontally onto the deck 4 inches. The shingle exposure on the job is 5 inches. If you start the first step-flashing unit flush with the bottom of the first full shingle course, how many step-flashing units do you need to reach a sidewall height of 30 inches above the starting point?
  1. Each step-flashing unit advances up the wall by one shingle exposure = 5 inches.
  2. Total wall height to cover = 30 inches.
  3. Number of units = total height ÷ exposure per unit = 30 ÷ 5 = 6 units.
  4. Verify: 6 units × 5-inch exposure = 30 inches. The 4-inch vertical leg of each unit extends above its own course so the next unit and shingle overlap it. No gap exists between units.
Answer: 6 step-flashing units are required.
3. Rake drip-edge pieces are 10 feet long and must lap each other by 2 inches in the direction of water flow (lower piece first, upper piece over it). The rake length on one side of the roof is 22 feet. How many full drip-edge pieces do you need, and what is the length of the cut piece at the top?
  1. Effective coverage per piece (except the last) = piece length minus lap = 10 ft − (2 in ÷ 12) = 10 − 0.167 = 9.833 feet per piece.
  2. Divide total rake length by effective coverage: 22 ÷ 9.833 ≈ 2.238, meaning 2 full pieces cover 2 × 9.833 = 19.667 feet.
  3. Remaining length for the third (top) piece = 22 − 19.667 = 2.333 feet = 2 feet 4 inches.
  4. You need 2 full pieces plus one piece cut to 2 feet 4 inches, for a total of 3 pieces purchased.
Answer: 3 pieces total: 2 full 10-foot pieces and one piece cut to approximately 2 feet 4 inches.
4. A counter-flashing cap must embed into a reglet to a depth of ¾ inch and then lap down over the step-flashing leg at least 3 inches. If the total vertical height of the two-piece counter-flashing unit from the reglet entry to the bottom hem is 5 inches, is the 3-inch minimum coverage of the step-flashing leg met?
  1. Total unit height = 5 inches.
  2. Subtract the reglet embed depth: 5 − 0.75 = 4.25 inches of counter-flashing extend below the reglet.
  3. The exposed lap covering the step-flashing leg = 4.25 inches.
  4. Compare to minimum: 4.25 inches > 3 inches required.
  5. Requirement is met with 1.25 inches of margin.
Answer: Yes — the counter flashing provides 4.25 inches of coverage over the step-flashing leg, exceeding the 3-inch minimum by 1.25 inches.

The math in this lesson1

Learners count rake drip-edge pieces allowing 2-inch laps and step-flashing units per 5-inch course.
6.RP.3
In class: Instructor demonstration on a 4:12 framed roof mock-up: install eave drip-edge under underlayment and rake drip-edge over underlayment, explaining the reason for each sequence; then install a W-valley metal unit with correct centering, end-dams, and clip fastening; then step-flash a simulated sidewall chase by alternating shingle and step-flashing units up the rake; then set and seal a two-piece counter flashing into a saw-cut reglet in a concrete-block chase simulator. · Partner practice: in pairs, students re-install all four flashing types on the same or an identical mock-up using only the manufacturer detail sheet as a guide; one student installs while the other reads dimensions aloud and records steps in a lab log; partners then switch roles for a second panel. · Peer inspection drill: each pair inspects another pair's finished mock-up using a written inspection checklist (drip-edge lap direction, valley centering, step-flashing exposure, counter-flashing embed depth, sealant continuity, fastener pattern); each discrepancy is written up as a deficiency notice with a sketch of the corrective action required.
Materials: Framed 4:12 roof mock-ups (one per pair, minimum), concrete-block chase simulator, 26-gauge galvanized W-valley, aluminum drip-edge, step flashing units, two-piece counter flashing, roofing nails and screws, pneumatic nailer, hammer, chalk line, tape measure, urethane roofing sealant, caulk gun, underlayment, three-tab shingles, inspection checklists, lab log forms, NCCER Roofing Level 1 Core Curriculum and applicable module
Check: Instructor uses the same inspection checklist to independently evaluate each pair's mock-up; all critical items (sequence, laps meeting minimum specification, no exposed fasteners in watershedding field, sealant continuity at counter-flashing) must be met; pass = zero critical deficiencies and no more than two minor deficiencies. Students correct deficiencies before the lesson is marked complete.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NCCER Roofing — Flashing and Waterproofing
1. At the eave, drip-edge is installed BEFORE the underlayment. What is the primary reason for this sequence?
NCCER Roofing — Flashing and Waterproofing
2. At the rake, drip-edge is installed AFTER the underlayment. Which of the following best explains this sequence?
NCCER Roofing — Flashing and Waterproofing
3. When installing a W-valley, fasteners should be placed:
NCCER Roofing — Flashing and Waterproofing
4. Each step-flashing unit is nailed to the roof deck with one nail placed HIGH on the vertical leg. Why is the nail positioned high and to the deck only?
NCCER Roofing — Flashing and Waterproofing
5. After setting a two-piece counter flashing into a reglet, where should urethane sealant be applied?
NCCER Roofing — Flashing and Waterproofing
6. An inspector finds that valley W-metal sections lap only 4 inches instead of the manufacturer's required 6 inches. This deficiency is best described as:
OSHA Fall Protection / General Safety
7. When cutting metal drip-edge with tin snips, which personal protective equipment is MOST important in addition to safety glasses?
NCCER Roofing — Flashing and Waterproofing
8. During peer inspection, a student notes that one step-flashing unit's horizontal leg is visible below the bottom edge of the overlying shingle course. The correct deficiency write-up should specify:
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.