🚧 Under construction — VoTechWorks is being built. A free tech program — complimentary, as our commitment to get America working.
voTechWorksGrade 13 · a vocational technology learning center, by urbanicity
newSchoolWorks.com › VoTechWorks › Building & Construction › Roofing › Asphalt Shingle Roofing › Lesson 1
BLD-ROOF12-02 · Lesson 1 · 9 clock hours · theory

Shingle Materials, Codes, and Deck Preparation

Objective. Students will identify the properties of three-tab and architectural shingles, underlayment types, and drip edge profiles, and explain deck-preparation steps required before any shingle is installed.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

What This Lesson Covers

Before a single shingle is nailed down, a roofer must know the materials, understand the code requirements, and confirm the deck is solid. Skipping any of those steps invites leaks, failed inspections, and voided warranties. This lesson covers shingle types, underlayment and drip edge selection, and the deck-preparation routine that sets up every successful asphalt-shingle job.

Asphalt Shingle Types

Three-tab shingles are the traditional flat, single-layer shingle. Each strip has two slots (tabs) cut into its bottom edge, giving the appearance of three separate pieces. They are lighter, thinner, and generally less expensive than architectural shingles. Wind-resistance ratings and warranty lengths are typically lower than architectural products. Three-tab shingles are still specified on budget-driven work and repair jobs where matching existing material matters.

Architectural shingles (also called laminated or dimensional shingles) bond two layers of fiberglass-reinforced asphalt mat together with staggered cutouts. The layered construction creates a shadow line that mimics wood shake. They are heavier, thicker, and carry higher wind and impact ratings. Most residential new construction today specifies architectural shingles. Because they are heavier, verify that the roof structure is engineered to carry the added load before using them on a re-roof.

Both types are manufactured to ASTM International standards. The key physical properties to check on the packaging are: fire rating (Class A, B, or C), wind-resistance rating (miles per hour), impact rating (UL 2218 Class 1–4 where required), and the manufacturer's minimum slope requirement, which is typically printed prominently on every bundle.

Underlayment Types

Underlayment is the secondary water-resistive layer installed directly on the deck before shingles. It is not optional—building codes and manufacturer warranties both require it.

Asphalt-saturated felt is the traditional product, available in No. 15 and No. 30 weights. Heavier felt is more tear-resistant during installation. Felt can absorb moisture and wrinkle, so it should be installed and shingled promptly.

Synthetic underlayment is woven or non-woven polypropylene or polyester. It is lighter, stronger, and more slip-resistant underfoot than felt. It can be left exposed longer without degrading. Many manufacturers now require or strongly recommend synthetic underlayment to maintain their full warranty.

Ice-and-water shield is a self-adhering, rubberized-asphalt membrane. It seals around fastener penetrations and bonds tightly to the deck. Building codes in most cold climates require it at eaves, in valleys, around penetrations, and along rakes where ice dams are a risk. The required coverage width varies by code jurisdiction—always check the local adopted code and the shingle manufacturer's instructions together.

Drip Edge Profiles

Drip edge is a corrosion-resistant metal flashing installed at eaves and rakes to direct water off the deck edge and into the gutter or away from the fascia. The two most common profiles are:

Drip edge is installed before underlayment at the eaves and over underlayment at the rakes. Getting this order wrong is a common defect that allows wind-driven rain to travel under the material.

Deck Preparation

A bad deck produces a bad roof, no matter how expensive the shingles are. Follow these steps before any material goes down.

1. Visual and physical inspection. Walk the deck systematically. Probe every area with a hammer handle or your boot. Soft or spongy spots indicate wet, rotted, or delaminated sheathing that must be replaced—not covered over.

2. Confirm sheathing thickness and fastening. Most codes require a minimum sheathing thickness for shingle application; verify against the local adopted building code. Check that all sheathing panels are fastened per code spacing requirements at edges and in the field. Missing or popped fasteners must be added or replaced with ring-shank or deformed-shank nails appropriate to the sheathing thickness.

3. Check and correct gaps. Sheathing joints should have a small gap (typically 1/8 inch) to allow for expansion. Gaps larger than code allows can telegraph through the finished shingle surface and cause shingles to crack over time. Add H-clips or sister a new piece of sheathing if gaps are excessive.

4. Nail down protruding fasteners. Any nail head that is not flush will create a high spot, cause shingles to bridge, and can puncture underlayment.

5. Sweep the deck clean. Debris under underlayment creates bumps and voids that compromise the waterproof layer.

6. Snap chalk lines. Reference lines keep courses running straight and expose any rafter or truss irregularities that need correction before installation starts.

Safety Notes

Deck work is fall-hazard work from the first step onto the roof. OSHA requires fall protection at six feet above a lower level on construction sites. Personal fall arrest systems, guardrails, or safety nets must be in place before you begin the inspection. Wear slip-resistant footwear; wet or damp OSB and plywood are extremely slippery. When probing for soft spots, maintain three points of contact and position your body weight on sound sheathing. Never stand on an area you have not yet confirmed is solid.

Key terms8

Three-tab shingleA single-layer asphalt shingle strip with two cutouts that create three uniform tabs along the bottom edge; lighter and typically lower-rated than architectural shingles.
Architectural (laminated/dimensional) shingleA multi-layer asphalt shingle that bonds two mat layers together to create a textured, shadow-line appearance; heavier and generally higher-rated for wind and impact than three-tab.
Ice-and-water shieldA self-adhering, rubberized-asphalt membrane applied directly to the deck at vulnerable areas (eaves, valleys, penetrations) to resist water intrusion from ice dams and wind-driven rain.
Synthetic underlaymentA woven or non-woven polypropylene or polyester sheet installed over the deck as a secondary water-resistive barrier; lighter and more UV-stable than asphalt-saturated felt.
Drip edgeCorrosion-resistant metal flashing installed at eaves and rakes to direct water away from the deck edge and fascia and prevent capillary wicking back under roofing materials.
Deck (roof sheathing)The structural panel layer—typically plywood or oriented strand board (OSB)—nailed to rafters or trusses that provides the nailing surface for roofing materials.
UnderlaymentThe secondary water-resistive sheet material (felt or synthetic) installed between the roof deck and the finish shingles; required by code and most manufacturer warranties.
Minimum slope requirementThe lowest roof pitch, expressed in rise over run (e.g., 4:12), at which a manufacturer permits standard shingle installation without special low-slope procedures.
In class: Material identification exercise: students sort a sample set of shingles, underlayments (felt and synthetic), ice-and-water shield, and drip edge profiles into labeled categories and record manufacturer specs from the packaging. · Deck inspection simulation: using a pre-built 4×8 plywood mock deck panel with planted defects (soft spots, missing fasteners, gaps at sheathing joints), students probe, mark, and write a punch-list report. · Code and specification reading: students read a manufacturer installation instruction sheet and answer a structured worksheet identifying minimum slope requirements, fastener type and count, and warranty-voiding conditions.
Materials: Sample shingles (three-tab and architectural), synthetic and felt underlayment rolls, ice-and-water shield, drip edge samples, defect mock deck panel, hammers, pry bars, NCCER Roofing Level 1 Trainee Guide, manufacturer installation instructions
Check: Written worksheet score of 75% or higher on material identification and code-reading questions; instructor verifies punch-list contains all planted defects before student moves on.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NCCER Roofing – Materials and Components
1. What structural difference distinguishes an architectural shingle from a three-tab shingle?
NCCER Roofing – Materials and Components
2. Ice-and-water shield is required by code at the eaves primarily to protect against which hazard?
NCCER Roofing – Roof Deck Preparation
3. During deck preparation, a roofer probes the sheathing and finds a soft, spongy area near the eave. The correct action is to:
NCCER Roofing – Materials and Components
4. At which location is drip edge installed OVER the underlayment rather than under it?
NCCER Roofing – Materials and Components
5. Which underlayment type self-seals around roofing fasteners that penetrate it?
NCCER Roofing – Codes and Standards
6. A manufacturer's installation instruction sheet lists a minimum slope of 4:12 for standard installation. A homeowner's roof has a 2:12 pitch. Which statement is correct?
OSHA Fall Protection
7. Under OSHA regulations, fall protection is required on a construction site when a worker is exposed to a fall of how many feet or more to a lower level?
NCCER Roofing – Roof Deck Preparation
8. When preparing a deck, a roofer finds sheathing joints with gaps larger than acceptable limits. What is the most likely long-term consequence if this defect is not corrected before shingles are installed?
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.