MFG-DRAF17-03 · Lesson 10 · 12.5 clock hours · lab

Linked Models, Coordination, and Clash Detection Basics

Objective. Students will link an architectural Revit model and a supplied MEP Revit model, use the Coordination Review tool to detect and document clashes between structural elements and ductwork, and produce a clash report.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed engineer or certified journey-level tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Linked Models and the BIM Coordination Workflow

In real projects, a building is never designed by one person or one discipline. The architect models walls, floors, and roofs; the structural engineer models columns and beams; the MEP (mechanical, electrical, and plumbing) engineer models ductwork, piping, and conduit. Revit's linked model system lets each discipline work in its own file while still seeing—and coordinating with—every other discipline. This lesson focuses on linking an MEP model into your architectural host model and using Revit's built-in Interference Check tool to find clashes before they become expensive field problems.

What Is a Revit Link?

A Revit Link (RVT) is a live reference to an external Revit file. Unlike importing geometry, a link stays connected to its source file. When the MEP engineer updates their model, you reload the link and your coordination view updates automatically. The link does not merge the two files; it overlays them, which keeps file ownership and edit permissions clean.

To insert a link, go to Insert tab → Link Revit. In the dialog you choose a positioning method. For this lab you will use Auto – Origin to Origin, which aligns the shared origin point of both files. This is the standard method when both teams have agreed on a common project base point and survey point at the start of the project. If the model appears offset or rotated after linking, that is a sign the origins were not coordinated upstream—a common real-world problem worth flagging immediately.

After inserting, use Temporary Hide/Isolate (the sunglasses icon on the View Control Bar) to isolate levels or categories and confirm the MEP ductwork sits inside the correct floor-to-floor zone. If a duct appears in the wrong story, recheck the origin alignment before proceeding.

Managing Linked Model Visibility

Linked files appear in the Visibility/Graphic Overrides dialog under the Revit Links tab. You can expand each linked file and control visibility by category—for example, turning off architectural walls in the linked model to reduce visual clutter while still showing MEP ductwork. This does not affect the source file; it only controls what you see in your view.

What Is a Clash, and Why Does It Matter?

A clash (also called an interference) occurs when two elements physically occupy the same space in the model. The most common clash in construction is a structural beam running through a duct run. In the field, fixing this conflict may require re-routing duct, lowering a beam, or raising a ceiling—all of which cost time and money. Catching clashes in the model before fabrication or construction begins is one of BIM's highest-value contributions.

There are two types of clashes you will encounter:

Revit's Interference Check tool detects hard clashes between selected categories.

Running the Interference Check

Navigate to Collaborate tab → Coordinate panel → Interference Check → Run Interference Check. In the dialog, set the left column to Structural Framing (from your host model) and the right column to Ductwork (from the linked MEP model—select the linked file from the drop-down). Click OK.

Revit returns the Interference Check Report dialog listing every clash as a row. Each row shows the element category, the element ID, and the intersecting element ID. Clicking a row zooms the active view to the clash location. Review each clash carefully—some may be minor overlaps at model boundaries that a structural engineer would accept; others will be significant conflicts requiring redesign.

Exporting the Report and Documenting Clashes

Click Export in the Interference Check Report dialog to save an HTML file. Open it in a browser to confirm it lists each clash with element IDs, categories, and the date/time the check was run. You will convert this to PDF (or print to PDF) and then annotate it with a PDF markup tool.

For each of the three clashes you document:

1. Record both element IDs.

2. Note the categories involved and the floor level.

3. Describe where in the building the conflict occurs (e.g., "Third-floor corridor, grid line C-4").

4. For at least one clash, propose a resolution—such as lowering the duct run by a specified amount, re-routing around the beam, or requesting a structural review to use a shallower beam profile.

Your written description should be clear enough that someone not looking at the model can understand the problem and the proposed fix.

Safety and Professional Practices

Coordination work is performed entirely on CAD workstations. Standard workstation safety applies: adjust monitor height and chair so your eyes are level with the top third of the screen, take short breaks to prevent eye strain and repetitive-strain injury, and keep liquids away from keyboards. When working with large linked models, Revit can consume significant RAM; do not force-quit the application without saving, as this can corrupt the central file in a workshared environment. Always work on a local copy or a detached copy when the exercise file is not a workshared project, so you do not overwrite the class master file.

Key terms9

Revit Link (RVT)A live, non-merged reference to an external Revit project file that overlays geometry from another discipline's model into the host model for coordination purposes.
Auto – Origin to OriginA Revit link positioning method that aligns the internal origin point of the linked file exactly to the internal origin of the host file, assuming both teams coordinated a shared origin at project start.
Interference CheckA built-in Revit tool (Collaborate tab) that compares two selected categories or model sources and identifies every location where elements physically overlap in 3D space.
Hard ClashA conflict in which two solid model elements occupy the same physical space, such as a structural beam passing through a duct.
Soft Clash (Clearance Clash)A conflict in which two elements are closer than a required minimum clearance distance, even if they do not directly intersect.
Element IDA unique integer assigned by Revit to every element in a model; used in interference reports to identify exactly which objects are clashing so they can be located and reviewed.
Coordination ReviewA Revit workflow and associated toolset that allows teams working with linked models to monitor, communicate, and resolve changes or conflicts between disciplines over time.
Temporary Hide/IsolateA view-control feature in Revit that temporarily hides or isolates selected elements or categories in the active view without deleting them or changing their properties.
Visibility/Graphic OverridesA per-view dialog in Revit (shortcut VG) that controls the visibility, line weight, color, and transparency of every category and linked file in the current view.
In class: Students insert a supplied MEP model as a Revit Link (RVT), set it to Auto – Origin to Origin positioning, and confirm it overlays correctly with their architectural model using temporary hide/isolate to compare levels. · Students use the Interference Check tool (Collaborate tab) to run a clash detection between the Structural Framing and Ductwork categories; results are reviewed in the Interference Check Report dialog. · Students export the interference report to HTML, annotate a PDF with three identified clashes marked by Revit element IDs, and draft a two-paragraph written description of each clash and a proposed resolution for one.
Materials: Revit workstations, supplied MEP RVT link file, Autodesk Revit Coordination Review documentation, PDF annotation tool.
Check: HTML report and annotated PDF submitted. Pass: report contains at least three identified clashes with element IDs; written description addresses one clash with a plausible resolution.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

Autodesk Certified User – Revit core concepts
1. Which Revit link positioning method aligns the linked file's internal origin directly to the host model's internal origin?
Autodesk Certified Professional – BIM coordination
2. An MEP duct and a structural beam occupy the exact same space in a Revit model. This is classified as which type of clash?
Autodesk Certified User – Revit interface navigation
3. On which Revit ribbon tab is the Interference Check tool located?
Autodesk Certified Professional – BIM coordination
4. When setting up an Interference Check between your host model's structural framing and ductwork in a linked MEP file, how must the right-column source be set?
Autodesk Certified Professional – BIM coordination
5. A student links an MEP model using Auto – Origin to Origin but the ductwork appears one full story above the correct level. What is the most likely cause?
Autodesk Certified User – Revit documentation
6. What information does a Revit Interference Check Report row provide that allows a drafter to locate a clashing element in the model?
Autodesk Certified Professional – BIM coordination
7. A drafter proposes resolving a beam-duct clash by lowering the duct run by 8 inches to pass beneath the beam flange. Before recommending this fix, which coordination step is most important?
Autodesk Certified User – Revit view management
8. Which Revit feature should a student use to temporarily display only the MEP ductwork in a view—without deleting or changing any elements—to verify that the linked model overlaid correctly?
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.