🚧 Under construction — VoTechWorks is being built. A free tech program — complimentary, as our commitment to get America working.
voTechWorksGrade 13 · a vocational technology learning center, by urbanicity
newSchoolWorks.com › VoTechWorks › Technology & Design › GIS / Surveying / Drone Operations › Construction Layout: Field Stakeout and Grade Control › Lesson 1
TEC-GIS45-05 · Lesson 1 · 10 clock hours · theory

Construction Site Safety and Coordination

Objective. Students identify struck-by, caught-in, and excavation hazards on active construction sites and select the correct PPE and safe-positioning practices before entering any field session

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by an industry-certified professional or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Why Construction Site Safety Matters for Survey Crews

Survey and stakeout crews work in one of the most hazardous environments in any trade: the active construction site. Heavy equipment moves constantly, excavations open and close, and materials are lifted overhead. Unlike office GIS work, field stakeout puts you within feet of these hazards. Understanding the major hazard categories, the personal protective equipment (PPE) required, and how to position yourself safely is not optional — it is a condition of entry to every field session in this course and a core expectation of every employer who hires survey technicians.

The Three Primary Hazard Categories

Struck-By Hazards

A struck-by event occurs when a worker is hit by a moving object — a vehicle, a swinging crane load, a thrown tool, or debris ejected by equipment. OSHA identifies struck-by incidents as one of the leading causes of construction fatalities. Survey crews are especially exposed because their work requires them to stand still, focus on instruments, and sometimes turn their backs to traffic or equipment to read rod shots or check data collectors.

Control measures for struck-by hazards include:

Caught-In / Caught-Between Hazards

Caught-in or caught-between events happen when a worker's body or clothing is caught in, on, or between objects — rotating machinery, pinch points between a vehicle and a fixed structure, or collapsing trench walls. For survey crews, the most relevant caught-in risks are proximity to rotating augers, compactors, and concrete mixers. Loose clothing, long hair, and dangling lanyards increase risk.

Control measures include keeping a safe distance from all rotating machinery, securing loose clothing and hair, and never reaching into an operating machine to retrieve a pin, stake, or data cable.

Excavation and Cave-In Hazards

Excavation hazards are among the most deadly on any site. An unprotected trench can collapse with little or no warning. Soil weighs approximately 100 pounds per cubic foot; even a small cave-in can pin and suffocate a worker within minutes. OSHA regulations require protective systems — sloping, shoring, or trench boxes — for excavations deeper than 5 feet, and a competent person must classify the soil type before workers enter.

Survey crews frequently must take shots inside or at the edge of open excavations to set grade stakes or verify as-built elevations. Safe practices include:

Personal Protective Equipment for Active Construction Sites

The minimum PPE for any survey crew member on a construction site is:

Site-specific hazards may require additional PPE such as hearing protection near loud equipment, gloves when handling rebar or stakes, and hard-soled boots with ankle support on rough terrain. Always review the site-specific safety plan before your first visit.

The Job-Hazard Analysis (JHA) and Pre-Task Briefing

Before beginning any stakeout task, the crew chief leads a pre-task safety briefing using a Job-Hazard Analysis (JHA) form. The JHA lists each task step, the hazards present at that step, and the controls in place. All crew members review and sign the JHA before work begins.

The pre-task briefing should cover:

1. The day's stakeout scope — what you are setting, where, and in what order

2. Active equipment in the work zone and the communication plan with operators

3. Emergency procedures — where the first-aid kit is, who calls 911, the nearest hospital

4. Any changes to site conditions since the last visit

The safety monitor's role during field work is to watch for hazards the instrument operator and rod person cannot see while they are focused on measurements. This is not a passive role — the safety monitor speaks up immediately when a hazard enters the work zone.

Surveyor Responsibilities Near Active Machinery

A common misconception is that equipment operators are solely responsible for avoiding workers. In reality, everyone on the site shares responsibility. Survey crew members must:

Entering the Field: Requirements for This Course

No student enters any field session without completing the OSHA 10 Construction Outreach training and holding a valid OSHA 10 card (or a documented equivalent accepted by the instructor). A written safety quiz score of 80% or higher is required before the first field session. These requirements exist because the skills in this lesson are directly assessed on both the NSPS CST Level 1 exam and in the professional judgment expected of all survey technicians.

Key terms10

Struck-By HazardA hazard in which a worker is injured by contact with a moving object such as a vehicle, swinging load, or flying debris; one of OSHA's leading causes of construction fatalities.
Caught-In / Caught-Between HazardA hazard in which a worker's body or clothing is caught in, on, or between objects such as rotating machinery or collapsing structures.
Excavation Cave-InThe sudden collapse of the walls of an open trench or excavation; can pin and suffocate a worker rapidly because soil is extremely heavy per cubic foot.
Competent PersonAn individual designated by OSHA regulations who is capable of identifying existing and predictable hazards — such as soil instability in an excavation — and has authority to take corrective action.
Job-Hazard Analysis (JHA)A written form that breaks a task into steps, identifies the hazards at each step, and lists the controls used to eliminate or reduce each hazard; reviewed and signed by all crew members before work begins.
High-Visibility VestGarment meeting ANSI/ISEA 107 standards that makes workers visible to equipment operators and drivers; Class 2 is the minimum for most active construction sites.
Personal Protective Equipment (PPE)Equipment worn by workers to minimize exposure to hazards; includes hard hats, safety glasses, high-visibility vests, and steel-toed boots as the baseline for construction sites.
Pre-Task Safety BriefingA short, structured meeting led by the crew chief before each work session to review the JHA, identify that day's specific hazards, establish communication plans with equipment operators, and confirm emergency procedures.
Safety MonitorA designated crew member whose primary duty during field operations is to watch for approaching hazards that the instrument operator and rod person cannot observe while focused on measurements.
OSHA 10 ConstructionA 10-hour construction safety outreach training program developed by the Occupational Safety and Health Administration covering major construction hazards; completion is documented with an OSHA 10 card.
In class: Watch and annotate OSHA 10 construction module video segments on excavation cave-in and struck-by hazards; students list one control measure per hazard on a T-chart · Role-play a pre-task safety briefing: one student plays the survey crew chief, one the equipment operator, and one the safety monitor, using a printed job-hazard analysis form for a stakeout scenario · Complete a written site-safety quiz and discuss answers as a class, correcting misconceptions about surveyor responsibilities near active machinery
Materials: OSHA 10 Construction Outreach materials, site-specific job-hazard analysis template, high-visibility vests, hard hats, safety glasses, steel-toed boots, printed struck-by statistics from OSHA publications
Check: 100% completion of OSHA 10 Construction card (or documented equivalent from Course 1); written safety quiz score of 80% or higher required to enter any subsequent field session

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

Construction site safety / NSPS CST L1
1. A survey crew is setting grade stakes adjacent to an active excavator. Before entering the excavator's swing radius, what is the most important first action?
Construction site safety / NSPS CST L1
2. Which of the following is classified as a caught-in hazard for a survey crew member?
Construction site safety / NSPS CST L1
3. OSHA regulations require a protective system — such as sloping, shoring, or a trench box — for excavations that reach what minimum depth?
Construction site safety / FAA Part 107 site awareness / NSPS CST L1
4. A survey crew is working on an active road construction site. What is the minimum ANSI/ISEA 107 vest class required for most active construction sites near vehicle traffic?
Construction site safety / NSPS CST L1
5. During a pre-task safety briefing, the crew chief reviews the Job-Hazard Analysis form. Which information must the JHA include?
Construction site safety / NSPS CST L1
6. A rod person must take an elevation shot inside an open 6-foot trench that has no protective system in place. What is the safest approach?
Construction site safety / NSPS CST L1
7. What is the primary role of the designated safety monitor during a stakeout operation?
Construction site safety / Program policy
8. A student has scored 75% on the written site-safety quiz. According to course policy, what happens next?
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.