Objective. Students define a measurable analytical question, locate and acquire at least two appropriate datasets, and complete a written data management and ethics plan that passes peer and instructor review.
This lesson, its worked examples and its practice questions has not yet been verified by an industry-certified professional or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Every successful data science project begins long before the first line of code is written. The decisions you make in the first few days—what question you are asking, where your data comes from, and how you will protect the people whose information is in that data—shape every result that follows. This lab walks you through the three foundational tasks: scoping your project, acquiring appropriate datasets, and completing an ethics and data management plan.
A project scope document is not a vague statement of interest. It is a precise agreement between you and your stakeholders about what you will measure, for whom, and how you will know when you have succeeded. A strong one-page project brief includes four elements:
This process mirrors the CRISP-DM (Cross-Industry Standard Process for Data Mining) framework, which begins with Business Understanding before any data is touched. IBM's Data Science Professional curriculum emphasizes CRISP-DM as the standard lifecycle model for applied projects.
Public repositories give you a wide range of real-world data without licensing barriers. Key sources include data.gov (federal datasets across agencies), the U.S. Census Bureau (demographic and economic data), the CDC (public health statistics), local and municipal open-data portals, and Kaggle (curated datasets often used for practice projects).
Not every dataset you find is appropriate. Evaluate each candidate against a structured checklist:
| Criterion | Questions to ask |
|---|---|
| Provenance | Who collected this data? Is the source authoritative? |
| License | Are you permitted to download, use, and share results? |
| Completeness | What percentage of key fields are populated? Is missingness random or systematic? |
| Temporal coverage | Does the date range match your question? Is it current enough? |
| PII risk | Does the dataset contain names, addresses, social security numbers, dates of birth, or other personally identifiable information? |
CompTIA Data+ Domain 1 (Data Concepts and Environments) covers data sourcing, governance, and the importance of understanding data quality before use—the same principles you apply in this checklist.
Document every dataset you download with a full citation: source name, dataset title, publication or update date, URL, and the date you accessed it. This protects you if the source changes later and demonstrates professional practice.
Working with real-world data carries responsibility. Even public datasets can contain sensitive attributes—race, income, health status, geographic location fine enough to identify individuals—that require careful handling. This is not a compliance formality; it is the ethical foundation of trustworthy analytics.
Your data management and ethics plan should address five areas:
1. Sensitive attributes: List any variables that could identify or harm individuals or groups if mishandled. Fields such as age, sex, race/ethnicity, ZIP code, and diagnosis codes can be sensitive even when names are removed, because combinations of attributes may re-identify people.
2. De-identification steps: Describe what you will do to reduce PII risk. Common techniques include removing direct identifiers (names, ID numbers), aggregating fine-grained geographic data to a coarser level, and suppressing cells with very small counts.
3. Storage and access controls: State where data will be stored (e.g., a password-protected folder on your institution's network or an encrypted cloud folder), who can access it, and how long you will retain it.
4. Bias and fairness considerations: Note whether the dataset over- or under-represents any population and how that might affect your conclusions.
5. Data-use acknowledgment: Sign a statement confirming you have read the dataset's license, that you will use the data only for your stated project purpose, and that you will not attempt to re-identify individuals.
This structure is modeled on Institutional Review Board (IRB) documentation used in academic and clinical research. While your capstone project may not require formal IRB approval, adopting the same disciplined thinking builds habits that every professional data scientist needs.
Data science does not involve physical machinery, but it does involve risks that practitioners must manage responsibly:
You may not proceed to exploratory data analysis until your instructor has approved both your project brief and your data management and ethics plan using the 10-point rubric, and you have at least two datasets downloaded with full citation documentation. The PII risk section is reviewed independently and must pass on its own. This gate exists to protect you, your data subjects, and the integrity of your final project.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.