Objective. Students will draft a written disaster-recovery plan that includes a backup schedule, retention policy, off-site or cloud storage procedure, restore runbook, and server-room safety practices aligned with OSHA general industry standards.
This lesson, its worked examples and its practice questions has not yet been verified by an industry-certified professional or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
A database that cannot be recovered after a failure is a liability, not an asset. Disaster recovery (DR) planning is the process of deciding—before anything goes wrong—exactly how data will be protected, where it will be stored, and how it will be restored. Regulators, auditors, and employers expect a written DR plan. The DAMA DMBOK2 classifies this work under Data Storage and Operations, one of the eleven knowledge areas of the Certified Data Management Professional (CDMP) body of knowledge.
A complete DR plan contains five components: a backup schedule, a retention policy, an off-site or cloud storage procedure, a restore runbook, and server-room safety practices. Each component is explained below.
A backup schedule answers three questions: what is backed up, how often, and what method is used. The three common backup types are:
A typical production schedule combines all three: a full backup on Sunday night, differential or incremental backups on weekdays, and transaction-log backups every fifteen to sixty minutes for databases that require minimal data loss.
A retention policy states how long each category of backup is kept before it is overwritten or destroyed. A common tiered structure is:
| Tier | Frequency | Retention |
|---|---|---|
| Daily | Every night | 7 days |
| Weekly | Sunday full | 4 weeks |
| Monthly | Last Sunday of month | 12 months |
| Annual | Year-end full | 7 years (or per legal requirement) |
Retention periods must satisfy both operational needs and any applicable regulatory requirements. When in doubt, consult your organization's legal counsel and document the decision in the plan.
Backups stored only on the same physical server they protect are not disaster recovery—they are a single point of failure. Every DR plan must define an off-site transfer method. Two practical options are:
Whichever method is chosen, the DR plan must document the transfer schedule, the encryption standard used, and the procedure for retrieving backups when needed.
A runbook is a written, step-by-step procedure that any qualified DBA can follow under pressure—at 2:00 a.m., with limited sleep, and possibly with the primary operator unavailable. A good runbook includes:
1. Prerequisites (access credentials location, hardware requirements, network access)
2. Steps numbered sequentially with expected output at each step
3. Estimated time for each major phase (restore from backup, apply logs, verify data integrity, bring application back online)
4. Rollback instructions if the restore fails
5. Verification checklist (row counts, application smoke tests, alert acknowledgment)
Estimated restore times should be measured during scheduled restore tests, not guessed. Most organizations require at least one full restore test per year; many require quarterly tests.
Two metrics define what a DR plan must achieve:
Both values are set by business stakeholders and must appear explicitly in the DR plan.
Data centers and server rooms contain physical hazards. OSHA's General Industry standards (29 CFR Part 1910) apply to workers in these environments. DBAs and operations staff must recognize common hazards and the appropriate controls.
Electrical hazards are present at every server rack and especially at electrical panels. Only qualified electricians may open electrical panels. Lockout/tagout (LOTO) procedures (29 CFR 1910.147) must be followed before any work on energized equipment. DBAs should never attempt electrical work—report faults to facilities.
Cable trip hazards exist wherever power and data cables run across walkways. Engineering controls include cable trays, conduit, and cable management arms. Administrative controls include housekeeping policies that prohibit loose cables in aisles. Anti-fatigue mats and cable covers are additional options.
Raised-floor panel removal exposes openings that can cause falls and exposes high-voltage cabling beneath the floor. An engineering control is to use proper panel-lifting tools and to place barriers around any open floor section. PPE includes safety-toed footwear.
Heavy rack components (servers, UPS units, battery modules) can cause musculoskeletal injuries. Engineering controls include server lift tools and two-person lift policies for components above a defined weight threshold. Administrative controls include written lift policies and training.
A safety section in every DR plan lists the physical hazards in the specific data center, the applicable control for each, and references the relevant OSHA standard.
A written DR plan is a living document. It must be reviewed whenever the database environment changes, tested at least annually, and stored in a location that is accessible even when the primary systems are down. When a real disaster strikes—ransomware, hardware failure, or natural disaster—the plan removes guesswork and reduces recovery time.